PELET supplied barrier post assemblies, as well as barrier rails and splice tubes, on both sides of this bridge crossing Pequea Creek. A less common element, PELET fabricated a radiused section to conform with the curve in the roadway.
The team at PELET is proud of our long resume of bridgework. Check out the long list of certifications and affiliations we have earned to be trusted to complete these fracture-critical projects.