PELET recently finished a rail system for a PADOT bridge in Bethlehem, PA. Subsequently, PELET welded and finished the structural components to the exact specifications determined by the PADOT engineers who worked on the project design. Review the images below – not only were vehicle railings included in this project

PELET fabricated this pedestrian handrail system for a bridge in Morris County, NJ. Not only is it functional to NJDOT standards, but it is also beautiful. Our scope for this project included fabrication, welding, finishing/painting, and delivery of the handrail pictured below.

Since 2014 the Schuylkill River Pedestrian Trail Boardwalk has been a beloved and well-used staple in the community. As a result, millions of people have experienced a wonderful view of the Philadelphia skyline from the waterfront. PELET fabricated the rail system for this extensive project. Although designed with safety and

PELET fabricated a PennDOT-approved pedestrian railing and hand railing for the 9th and 10th St. Bridge Project in Lebanon, PA. The project included fabricating both aluminum and steel railing. Finish coatings included galvanizing and powder coating. In the final inspection, and after installation by our customer, the finished project surpasses

With our AISC Fracture Critical Endorsement (FCM), PELET supplied the general contractor, J. D. Eckman, Inc. with the specified material and fabricated components to restore this historic truss bridge. Should any of the FCM components fail, the bridge would collapse. PELET has an impressive resume fabricating componets for cyclic, compression,

PELET was honored to make the monument stands for the “Steel Workers Memorial” located in Coatesville, PA. In memorial of the 9/11 Attacks, these stands hold a 35-ton steel “tree” section from the fallen World Trade Center. This piece framed the outside wall of the 110-story North Twin Tower’s first

PELET fabricated a stunning staircase for a customer outside of Philadelphia, PA. The structure is entirely cantilevered at the base and the top of the staircase. For this reason, the project was complex to fabricate. PELET found the solution to ensure the installed result would exceed the customer’s expectations. The

PELET fabricated the large heavy-duty carbon silo pictured, including forming the plate itself for the majority of this project. To finish the project, PELET coated the entire silo – inside and out – with a special high-temperature aluminum paint for a longer lifespan. To ensure safe travel, we fabricated and

Interested?

Let’s Get Started


610.384.5084