News & Articles

At PELET, we have been fabricating, welding, and finishing bridge railings for decades. In that time we have learned a thing or two about how to deliver on-spec, on-budget parts for these complex projects. Read on to see some recent examples of our work and contact us today to learn

Since 1954, we’ve been fabricating complex, heavy-duty structures throughout the Mid Atlantic region. And in that timeframe, we’ve learned a thing or two about how to do quality work, on time, on spec, and on budget. In addition, we’re proud to have been awarded some prestigious, difficult to obtain, industry

When looking for a structural fabricator for your next bridge, transportation, or industrial project, consider a company that puts quality first. When you can trust the project is done to specification, it saves a great deal of time, effort, aggravation, and cost down the road. A few considerations when looking

PELET recently finished a rail system for a PADOT bridge in Bethlehem, PA. Subsequently, PELET welded and finished the structural components to the exact specifications determined by the PADOT engineers who worked on the project design. Review the images below – not only were vehicle railings included in this project

PELET fabricated this pedestrian handrail system for a bridge in Morris County, NJ. Not only is it functional to NJDOT standards, but it is also beautiful. Our scope for this project included fabrication, welding, finishing/painting, and delivery of the handrail pictured below.

Since 2014 the Schuylkill River Pedestrian Trail Boardwalk has been a beloved and well-used staple in the community. As a result, millions of people have experienced a wonderful view of the Philadelphia skyline from the waterfront. PELET fabricated the rail system for this extensive project. Although designed with safety and

PELET fabricated a PennDOT-approved pedestrian railing and hand railing for the 9th and 10th St. Bridge Project in Lebanon, PA. The project included fabricating both aluminum and steel railing. Finish coatings included galvanizing and powder coating. In the final inspection, and after installation by our customer, the finished project surpasses

With our AISC Fracture Critical Endorsement (FCM), PELET supplied the general contractor, J. D. Eckman, Inc. with the specified material and fabricated components to restore this historic truss bridge. Should any of the FCM components fail, the bridge would collapse. PELET has an impressive resume fabricating componets for cyclic, compression,

Interested?

Let’s Get Started


610.384.5084